Blog
How to Replace the Sensors in an RKI GX-3R
Replacing a sensor in an RKI GX-3R is a designed-for owner job — the GX-3R's sensors are field-replaceable — and it runs in five moves: power the meter down, open the sensor access and remove the spent sensor, fit the correct new sensor for that channel like-for-like, reassemble and let the meter settle, then calibrate every channel as configured before the meter returns to service. That last move is not a finishing touch; a new sensor is uncalibrated by definition, and a GX-3R that goes back on
…
Nov 1st 2026
Fixed-Flow Regulator Flow Rates: 0.25, 0.5, or 1.0 L/min — Which Does Your Calibration Need?
The fixed-flow regulator your calibration needs is the one whose preset rate matches your instrument manual's specified flow — for most portable multi-gas calibrations that is 0.5 L/min, with 0.25 L/min serving low-flow procedures and 1.0 L/min serving instruments whose manuals call for a full liter. There is no adjustment to make later: a fixed-flow regulator is built at one rate, so the purchase is the decision. Too little flow starves the instrument — worst on a pumped meter, whose pump then
…
Nov 1st 2026
Contractor Gas Detectors on Your Site: Who Verifies the Calibration?
The host site verifies it. A contractor owns their detectors, but the moment those instruments work in your atmosphere, under your permits, the duty to confirm they are in calibration sits with the host — and the confirmation has to be a check, not a courtesy: a current calibration certificate matched to the instrument's serial number, a due date that covers the entire job window rather than just the start date, and bump-test discipline the host can observe during the work. Agreed in writing at
…
Nov 1st 2026
How Many Spare Gas Detectors Should a Plant Keep?
There is no universal spares percentage, and any post that gives you one is guessing with your safety budget. The right number of spare gas detectors is the sum of three drains you can actually count: the calibration pipeline (instruments in transit or on a bench at any given time, whose wearers still need coverage), the failure drain (instruments your own records show coming back from calibration needing a sensor, a repair decision, or replacement), and the peak drain (the difference between yo
…
Nov 1st 2026
Getting Your Own Fleet Ready for a Turnaround: The Calibration Push
Getting an owned fleet ready for a turnaround is a timing problem, not a calibration problem: start weeks before the outage, inventory every instrument by serial number and due date, and ship the fleet to CPS in staggered batches — one wave on the bench while the next is still covering daily work — so operations never stop and every detector lands on outage day one in date, with failures found early enough to fix calmly. The fleets that get hurt are the ones that ship everything the week before:
…
Nov 1st 2026